Delivery of machines
- Delivery of Double Layer Roll Forming Machine with Electric Cutting On Apr.15,2025The producing speed of our improved structure machine reach around 25m/min,efficiency is high.Delivery of machines April 16, 2025
- Delivery of Roll Forming Line Machine On Apr.12,2025Services to Customers --Spare Parts 1) Machine will be delivered with one free cost spare parts box. Normally, these spare parts are enough for machine running in 2-3 years. 2) Within the warranty, Zhongyuan will send a new onefreely to customer in the shortest time if confirm not man-made damage. Out of warranty, Zhongyuan will send a new one in the shortest time after client pays spare cost. 3) Saving whole machine design drawings lifetime, Zhongyuan can response immediately to make a new spare parts as saved data. --Just tell your spare parts requirement, Zhongyuan can supply accurate one, no matter how old your machine is.Delivery of machines April 14, 2025
- Delivery of Steel Sheet Cut To Length Line And Recoiling Machine On Mar.31,2025Services to Customers --Lifetime Service 1) All machines are offered with 36 months warranty. Within the warranty period, replacement of spare parts are charge-free. After guarantee time is expired, we supply machine’s lifetime maintenance service and supply spare parts at cost price. 2) The equipments from our company will be delivered accompanying with detail installation and operation manual. Zhongyuan can offer plant layout design by free of charge. --Machine lifetime served by Zhongyuan.Delivery of machines April 01, 2025
- Delivery of Tile Roll Forming Machine And 15T Hydraulic Decoiler with Coil Car On Mar.15,2025On-Line After-Sales Service Process Clients feedback about machine problems--with related video and pictures for enriching words descriptions; 2. After-sales team actively contact engineers and the assembling leaders to give clients an effective technical support within 24 hours; 1) Simple problem,give the solve steps after check with engineer.Or give online video teaching,help customer to solve the problem step by step. 2) Complicated problem or customer needs engineer to come,Zhongyuan will arrange engineer to come to solve problem on site in the fastest speed if client needs. --Zhongyuan has a mature and complete after-sales system.Delivery of machines March 17, 2025
- Delivery of 3 sets roll forming machine On Mar.8,2025Bearing Inside The Roller • Having bearing inside the rollers to make machine run with less loading so that rollers not easy to damage. • Ensure the same speed between the rollers, and improve the forming accuracy • Bearings are helping to prolong machine life.Delivery of machines March 10, 2025
- Delivery of Panel Roofing Machine with Electric Cutting On Feb.24,2025PRETECTIVE NET Preventing the damage and keeping safe when user working. It can be opened when machine need to do some maintain.Delivery of machines February 25, 2025
- Delivery of Roof Wall Panel Machine with Electric Cutting On Feb.17,2025CHAIN TRANSMISSION: Chain model is 16A-1,produced by Chinese famous manufacturer. Motor supply the power,chain help to move the machine.Delivery of machines February 18, 2025
- Delivery of CZ Purlin Roll Forming/roll Former On Jan.18,2025Load into Container 1.Zhongyuan has more than 15 years' container loading experience.Ensure machine can be loaded safely. 2. All components fixed by steel wire with container to ensure machine won't damage while shipping. 3.Zhongyuan will take pictures of each components in the container and show to client.Delivery of machines January 20, 2025
- Delivery of High Speed Roof Tile Machine for Sale On Jan.17,2025Safety cover: People-oriented design to protect worker's safety. It also can prevent the chain and gears from damaging by other objects.Delivery of machines January 20, 2025
- Delivery of Roof Wall Panel Machine On Jan.15,2025Processing Quality Control: Self-inspected by the staffs during production; Re-inspected by the team leader; And randomly inspected by quality inspectors. Unqualified components will be replaced and all treated as scrap.Delivery of machines January 16, 2025