Delivery of machines
- Delivery of steel metrocopo tile roofing roll forming machine On Aug.14,2024 To NigeriaFrame polished machine: Polish machine frame surface level to be more smooth after welded, help the machine installation more precise.Delivery of machines August 15, 2024
- Delivery of Steel Double Layer Roll Forming Machine with Electric Cutting On Aug.14,2024 To NigeriaNo power pre-cutting device, used to cut steel coils material. It will more easy and quick when need to change other steel coils. Double layer forming machine only can install the pre-cutter in upper layer,because there is no place to install in the down layer.Delivery of machines August 15, 2024
- Delivery of Double Layer Wall Sheet Roll Forming Machine with Electric Cutting On July.30,2024 To NigeriaWe have 5T、10T manual decoiler,and we also have 10T、15T hydraulic decoiler.Delivery of machines July 31, 2024
- Delivery of Metal Roof Roll Forming Machine Sale with Electric Cutting On July.26,20246)EUROPEAN STYLE WALL PLATE Wall plate thickness is 40mm,the structure is very strong and stable so that can prolong the machine life time. This structure is followed European design,looks high class.Delivery of machines July 29, 2024
- Delivery of automatic c purlin roll forming machine On June.18,2024Services to Customers --Technical Assistance 1) Rich-experienced technical team (mechanical, hydraulic, electrical, automation, etc.) 2) Can offer special, customized solutions to meet specific needs. 3) The equipments from Zhongyuan will be delivered accompanying with detail installation and operation manual. Plant layout design can also be suggested by free of charge. 4) Perfect after-sales system can help Zhongyuan supplies quick technical assistance. --On-line technical assistance or field technical assistance are optional.Delivery of machines June 19, 2024
- Delivery of standing seam roll former On June.18,2024 To IndiaAssembling Quality Control: Self-inspected by the staffs during assembling; Re-inspected by the team leader; And finally inspected by sales person and engineers. --We keep Real-time communication between all departments.Delivery of machines June 19, 2024
- Delivery of line roll forming machine On June.12,2024 To TurkeyRaw Material Quality Control: Steels bought from famous steel factory with inspection certificate.Other spare parts use famous brands. Use equipment to test whethter all the material can reach required hardness. Initial inspection by Warehouse staff, RE-inspection by CEO. Unqualified raw material will be returned.Delivery of machines June 13, 2024
- Delivery of floor deck roll forming machine On June.7,2024Shafts of rollers are tooled by grinding machine for two times to ensure the precision of final product.Delivery of machines June 11, 2024
- Delivery of automatic double layer roll forming machine On May.20,2024 To NigeriaInspection before shipment Double check all machine components and spare parts by Sales Department before shipment. --Any damage, replaced it in time.Delivery of machines May 21, 2024
- Delivery of beam roll forming machine On May.15,2024Unqualified Components Unqualified components will be re-processing again to reach the required standard,if can't,then treat as srcap and replace into a new one. ---All the components Zhongyuan using are with good quality and good accuracy.Delivery of machines May 16, 2024